Tool · ISO 19650

Your BIM implementation,
step by step.

Implement BIM on your project with clear, well-established steps per ISO 19650. Move phase by phase, tick each activity and track your progress — your progress is saved in this browser.

Start now
Implementation progress 0% complete
0 / 8 phases complete 0 / 48 activities done
Phase 1 · ISO 19650-1 · §5, §11

Governance & roles

Set the BIM authority and the information management function before modeling. Define who leads, who produces and who approves, using ISO 19650 terminology (appointing party, lead appointed party, appointed parties).

Key roles

Appointing party (client)Lead appointed partyBIM / Information ManagerBIM CoordinatorDiscipline leads

Deliverables

RACI matrixBIM org chartAssigned information management function
Phase checklist 0 / 6
Phase 2 · ISO 19650-1 · §5.1–5.2 · OIR/PIR/AIR/EIR

Information requirements

Translate business objectives into clear information requirements. From OIR and PIR/AIR you derive the EIR (Exchange Information Requirements): what information is needed, for which decision, in what format and by when.

Key roles

Appointing partyBIM ManagerInformation advisorEnd users / operations

Deliverables

OIRPIRAIREIRInformation needs plan
Phase checklist 0 / 6
Phase 3 · ISO 19650-2 · §5.3–5.4 · BEP

BEP & mobilization

The team answers the EIR with a BEP (BIM Execution Plan): pre-appointment to bid and post-appointment to deliver. Capability and capacity are assessed, and the MIDP/TIDP is built with owners and dates.

Key roles

Lead appointed partyBIM ManagerBIM CoordinatorDiscipline leads

Deliverables

Pre-appointment BEPPost-appointment BEPMIDPTIDPCapability assessment
Phase checklist 0 / 6
Phase 4 · ISO 19650-1 · §12 · CDE

Common Data Environment

Set up the CDE as the single source of truth. Establish states WIP → Shared → Published → Archived, file naming and review/approval workflows with traceability.

Key roles

BIM ManagerBIM CoordinatorCDE administratorAll appointed parties

Deliverables

Configured CDENaming conventionApproval workflowPermissions matrix
Phase checklist 0 / 6
Phase 5 · ISO 19650-2 · §5.5–5.6 · WIP

Model production (WIP)

Collaborative production of information in WIP state per the BEP standards, methods and procedures. Model to the agreed LOIN on shared coordinates with consistent data parameters.

Key roles

Discipline leadsBIM modelersBIM Coordinator

Deliverables

WIP models per disciplineShared coordinatesTemplates & parameters
Phase checklist 0 / 6
Phase 6 · ISO 19650-2 · §5.6 · QA/QC

Coordination & quality

Model federation and cross-model information control. Clash detection cycles, quality review (QA/QC) and approval before sharing. No model is coordinated unless it passes the minimum validations.

Key roles

BIM CoordinatorBIM ManagerDiscipline leads

Deliverables

Federated modelClash reportQA/QC reportCoordination minutes
Phase checklist 0 / 6
Phase 7 · ISO 19650-2 · §5.7 · Delivery

Information delivery

Formal delivery of the Project Information Model (PIM) at the agreed milestones. It is reviewed and authorized against the EIR and MIDP; the state moves to Published / Approved for construction (AFC/AFD).

Key roles

Lead appointed partyAppointing partyBIM Manager

Deliverables

Delivered PIMAFC/AFD documentationAcceptance record
Phase checklist 0 / 6
Phase 8 · ISO 19650-3 · Operación

As-built & operation

Project close-out and transition to operation. The as-built PIM feeds the Asset Information Model (AIM) per the AIR, enabling management and maintenance during the operational phase (ISO 19650-3).

Key roles

Appointing party / operatorBIM ManagerFacility Manager

Deliverables

As-built modelAIMAsset data & manualsProject close-out